2.2 MW Batteries (1 MW) + Solar Photovoltaic (1 MW) under construction in Monterey, CA — California Independent System Operator
2.2 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
—
Operating Since
Coordinates
36.8649, -121.7767
County
Monterey, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Catalyze Moss Landing Hilltop Rd Microgrid, LLC | Catalyze Moss Landing Hilltop Rd Microgrid | — |
| Owner(s) | Catalyze Moss Landing Hilltop Rd Microgrid, LLC | — | — |
| Status | Under construction | construction | — |
The Catalyze Moss Landing Hilltop Rd Microgrid, located in Monterey County, California, is a hybrid power plant with a total capacity of 2.2 MW. The facility is owned and operated by Catalyze Moss Landing Hilltop Rd Microgrid, LLC. The plant utilizes both solar photovoltaic technology and batteries, with the primary fuel listed as MWH. The solar component uses a fixed tilt tracking system.
The plant consists of two generators and operates within the California Independent System Operator (CAISO) balancing authority, part of the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, the plant is ranked 260th out of 300 power plants in California and 1101st out of 1205 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
0.48 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Agrilink Foods
Substation Distance
1.577 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
DUKMOSS1_7_N001
Pricing Hub
TH_ZP26_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match