1.5 MW Solar operating in Merced, CA — California Independent System Operator
1.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2018
Operating Since
Coordinates
37.0535, -120.6321
County
Merced, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Henry Miller Reclamation District | Henry Miller Reclamation District | — |
| Owner(s) | Henry Miller Reclamation District | — | — |
| Status | Operating | operating | — |
The Henry Miller RD solar photovoltaic plant is located in Merced County, California. The plant has a total capacity of 1.5 MW and began operating in 2018. It is owned and operated by the Henry Miller Reclamation District. The plant consists of a single generator utilizing fixed-tilt solar tracking technology.
The Henry Miller RD plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In its most recent year of reported generation, the plant produced 3,203 MWh of electricity, achieving a capacity factor of 24.3%. The plant ranks 644th in size among California's 862 power plants, and 5878th nationally out of 7108 plants.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
12 kV
Regulatory Status
NR
Entity Type
Commercial
Sector
Commercial Non-CHP
134 MWh
Latest Month
3.2K MWh
Annual Generation
24.3%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
SNTARTA_6_N001
Pricing Hub
TH_ZP26_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match