4.5 MW Solar operating in Riverside, CA — California Independent System Operator
4.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
34.0267, -117.5211
County
Riverside, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Catalyze Mira Loma 3251 De Forest Circle Microgrid LLC | Catalyze Mira Loma 3251 De Forest Circle Microgrid | — |
| Owner(s) | Catalyze Mira Loma 3251 De Forest Circle Microgrid LLC | — | — |
| Status | Operating | operating | — |
The CA Jurupa Valley 3251 De Forest Circle power plant is a 4.5 MW solar photovoltaic facility located in Riverside County, California. The plant began operating in 2024 and is owned and operated by Catalyze Mira Loma 3251 De Forest Circle Microgrid LLC. It consists of a single generator utilizing fixed-tilt solar tracking technology.
The plant's latest annual generation was 4,685 MWh, resulting in a capacity factor of 11.8%. It operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. The plant ranks 321st in size among California's 862 power plants, and 3255th nationally out of 7108 plants.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
0.48 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
422 MWh
Latest Month
4.7K MWh
Annual Generation
11.8%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
ETIWANDA_6_N023
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source