1.6 MW Solar operating in Fairfield, CT — ISO New England Inc.
1.6 MW
Nameplate Capacity
2
Generators
units
Solar Photovoltaic
Technology
2021
Operating Since
Coordinates
41.2718, -73.1223
County
Fairfield, CT
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Emerald Gardens PKI, LLC | — | — |
| Owner(s) | EG1 PKI Holdings, LLC | — | — |
| Status | Operating | — | — |
Emerald Gardens PKI, LLC is a solar photovoltaic power plant located in Fairfield County, Connecticut. The plant has a total capacity of 1.6 MW and consists of 2 generators utilizing fixed-tilt solar tracking technology. It is owned and operated by Emerald Gardens PKI, LLC. The plant began operating in 2021.
In its most recent year of operation, Emerald Gardens PKI, LLC generated 2,121 MWh of electricity, achieving a capacity factor of 15.1%. The plant operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. Emerald Gardens PKI, LLC ranks as the 54th largest solar plant in Connecticut out of 88, and 5659th nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
0.48 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
70 MWh
Latest Month
2.1K MWh
Annual Generation
15.1%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Pootatick Substation · 115 kV
Substation Distance
0.625 km
Operator
United Illuminating Company
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.POOTATCK13.8
Pricing Hub
.Z.CONNECTICUT
Node Source
Curated node match