49.9 MW Solar operating in Paulding, OH — PJM Interconnection, LLC
49.9 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
41.0923, -84.7257
County
Paulding, OH
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Timber Road Solar Park | EDPR Renewable Energy Sources of Greece 1 Sole Proprietorship [100%] | — |
| Owner(s) | Timber Road Solar Park | EDPR Renewable Energy Sources of Greece 1 Sole Proprietorship [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as EDPR Renewable Energy Sources of Greece 1 Sole Proprietorship [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
Timber Road Solar Park is a 49.9 MW solar photovoltaic power plant located in Paulding County, Ohio. The plant began operating in 2023 and has one generator. It is owned and operated by Timber Road Solar Park. The primary fuel source is solar energy. The plant ranks 37th out of 84 solar facilities in Ohio and 1185th nationally out of 7108.
The plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. In its latest year of operation, Timber Road Solar Park generated 99,640 MWh of electricity, achieving a capacity factor of 22.7%. The solar panels utilize single-axis tracking technology to maximize energy capture. Financial data is available for the plant from LBNL Solar.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
69 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
2.8K MWh
Latest Month
99.6K MWh
Annual Generation
22.7%
Capacity Factor
$39.9/MWh
LCOE (Levelized Cost)
$30.3/MWh
Energy Value
Point of Interconnection
Nearest Substation
Payne Station · 69 kV
Substation Distance
0.016 km
Operator
American Electric Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
PAYNE 69 KV T1
Pricing Hub
AEP-DAYTON HUB
Location Type
Load Node
Node Source
Curated node match
Last updated 2026-03-14