203 MW BESS operating in Crane, TX — Electric Reliability Council of Texas, Inc.
203 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2022
Operating Since
Coordinates
31.1917, -102.3172
County
Crane, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Crossett Power Management LLC | — | — |
| Owner(s) | Crossett Power Management LLC | — | — |
| Status | Operating | — | — |
Crossett Power Management LLC, located in Crane County, Texas, is a 203 MW battery energy storage system (BESS) that began operating in 2022. The facility is owned and operated by Crossett Power Management LLC. The plant is interconnected to the Electric Reliability Council of Texas (ERCOT) balancing authority, within the Texas Reliability Entity (TRE) NERC region. The primary fuel type is listed as MWH, indicating electricity as the input.
The facility consists of a single generator utilizing battery technology. The BESS has a total storage capacity of 400 MWh, with a duration of approximately 1.97 hours. The battery chemistry is Lithium Ion (LIB). Crossett Power Management LLC ranks as the 93rd largest power plant in Texas out of 224, and 257th nationally out of 514.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
−834 MWh
Net Charging
-10.9K MWh
Annual Net Energy
-0.6%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
No financial data available for this plant.
Market Position
ISO/RTO Market
ERCOT
LMP Node
CROSSETT_ALL
Pricing Hub
HB_WEST
Secondary Zone
LZ_WEST
Location Type
Resource Node
Node Source
Curated node match
Fire Weather Watch: Sacramento Foothills and Guadalupe Mountains; Chaves County Plains; Eddy Plains; Lea; Gaines; Dawson
Fire Weather Watch issued March 21 at 2:43AM CDT until March 23 at 12:00AM CDT by NWS Midland/Odessa TX
Fire Weather Watch: Sacramento Foothills and Guadalupe Mountains; Chaves County Plains; Eddy Plains; Lea; Gaines; Dawson
Fire Weather Watch issued March 21 at 2:43AM CDT until March 23 at 12:00AM CDT by NWS Midland/Odessa TX
Austin Energy contracts 100 MW of BESS capacity in Texas
US energy storage systems developer Jupiter Power LLC has struck a deal to deliver 100 MW of battery storage capacity to utility Austin...
Austin Energy contracts 100 MW of BESS capacity in Texas
US energy storage systems developer Jupiter Power LLC has struck a deal to deliver 100 MW of battery storage capacity to utility Austin...
Last updated 2026-03-21
View all 10 articles