7.5 MW Solar operating in Oneida, WI — Midcontinent Independent Transmission System Operator, Inc..
7.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2022
Operating Since
Coordinates
45.6085, -89.4424
County
Oneida, WI
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Wisconsin Public Service Corp | Wisconsin Public Service | — |
| Owner(s) | Wisconsin Public Service Corp | WEC Energy Group | — |
| Status | Operating | operating | — |
Hodag Solar is a 7.5 MW solar photovoltaic power plant located in Oneida County, Wisconsin. The plant began operating in 2022 and is owned by WEC Energy Group, with Wisconsin Public Service Corp. listed as the operator per EIA data. It utilizes single-axis tracking to maximize solar energy capture. Hodag Solar is connected to the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and resides within the ReliabilityFirst Corporation (RFC) NERC region.
The plant's latest annual generation was 12,613 MWh, resulting in a capacity factor of 19.2%. Hodag Solar is ranked as the 29th largest solar plant in Wisconsin out of 99, and 2035th nationally out of 7108. Financial data indicates an installed cost of $1,492.55 per kW, according to FERC filings.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
24.9 kV
Regulatory Status
RE
Entity Type
Investor-Owned Utility
Sector
Electric Utility
254 MWh
Latest Month
12.6K MWh
Annual Generation
19.2%
Capacity Factor
$1,497/kW
Installed Cost
Wisconsin Public Service Corporation
Reporting Utility
Cumulative Installed Cost
Per-Unit Cost Trends
Point of Interconnection
Nearest Substation
Highway Eight · 115 kV
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MICHIGAN.HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
Town of Rome solar project approved by PSC despite local opposition
The Wisconsin Public Service Commission voted unanimously on Thursday to approve a certificate of public convenience and necessity for Akron...
Utilities Propose $400M Solar-Battery Park In Kenosha County
The state's largest utility company, WEC Energy Group, is partnering with Madison Gas and Electric on a $400 million solar and battery...
WEC Energy Group to buy 80% stake in Illinois wind farm for $345 million
WEC Energy will have invested more than $1.2 billion in wind farms in the Midwest once the pending purchase closes.
Last updated 2026-03-26
View all articles