3 MW Solar operating in Pine, MN — Midcontinent Independent Transmission System Operator, Inc..
3 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2022
Operating Since
Coordinates
46.0054, -92.9080
County
Pine, MN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | DG Central 1, LLC | DG Central 1 | — |
| Owner(s) | DG Central 1, LLC | — | — |
| Status | Operating | operating | — |
Grand Casino Hinckley Solar is a 3 MW solar photovoltaic power plant located in Pine County, Minnesota. The plant began operating in 2022 and is owned and operated by DG Central 1, LLC. It utilizes a single-axis tracking system to maximize solar energy capture. The plant connects to the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and is within the MRO NERC region.
In its most recent year of operation, Grand Casino Hinckley Solar generated 5,628 MWh of electricity, achieving a capacity factor of 21.4%. The facility consists of a single generator. Based on its total capacity, Grand Casino Hinckley Solar ranks as the 154th largest solar plant in Minnesota out of 540, and 3927th nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
104 MWh
Latest Month
5.6K MWh
Annual Generation
21.4%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
OSM spatial match