74.5 MW Solar operating in Putnam, FL — Florida Power & Light Company
74.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
29.7570, -81.7591
County
Putnam, FL
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Florida Power & Light Co | Florida Power & Light | — |
| Owner(s) | Florida Power & Light Co | NextEra Energy | — |
| Status | Operating | operating | — |
Georges Lake is a 74.5 MW solar photovoltaic power plant located in Putnam County, Florida. The plant began operating in 2024 and has one generator utilizing single-axis tracking technology. It is owned by NextEra Energy and operated by Florida Power & Light Co (FPL). The plant is located within the Florida Power & Light Company balancing authority and the SERC NERC region.
In its most recent year of operation, Georges Lake generated 185,290 MWh of electricity, achieving a capacity factor of 28.4%. According to available data, the installed cost of the plant was $1,479 per kW. Georges Lake is ranked as the 170th largest power plant in Florida out of 227, and 911th nationally out of 7108 plants. The primary fuel source for the plant is solar energy.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Florida Power & Light Company
Grid Voltage
230 kV
Regulatory Status
RE
Entity Type
Investor-Owned Utility
Sector
Electric Utility
10.1K MWh
Latest Month
185.3K MWh
Annual Generation
28.4%
Capacity Factor
$1,479/kW
Installed Cost
Florida Power & Light Company
Reporting Utility
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.