10 MW Solar operating in Lee, SC — Duke Energy Progress East
10 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2022
Operating Since
Coordinates
34.2080, -80.2208
County
Lee, SC
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Bishopville Solar II, LLC | Bishopville Solar II | — |
| Owner(s) | Bishopville Solar II, LLC | — | — |
| Status | Operating | operating | — |
Bishopville Solar II, LLC is a 10 MW solar photovoltaic power plant located in Lee County, South Carolina. The plant, which began operating in 2022, utilizes single-axis tracking technology to maximize solar energy capture. It is owned and operated by Bishopville Solar II, LLC. The plant is connected to the Duke Energy Progress East balancing authority within the SERC NERC region.
In its most recent year of operation, Bishopville Solar II generated 17,382 MWh of electricity, achieving a capacity factor of 19.8%. Bishopville Solar II, LLC ranks as the 58th largest solar plant in South Carolina out of 143, and 1880th nationally out of 7108 plants. Financial data is available for this plant from LBNL, suggesting transparency in its economic performance.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Duke Energy Progress East
Grid Voltage
23 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
875 MWh
Latest Month
17.4K MWh
Annual Generation
19.8%
Capacity Factor
$58.3/MWh
LCOE (Levelized Cost)
$20.8/MWh
Energy Value
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.