1.9 MW Solar operating in Clackamas, OR — Portland General Electric Company
1.9 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2022
Operating Since
Coordinates
45.4313, -122.2957
County
Clackamas, OR
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Sandy River Solar, LLC | Sandy River Solar | — |
| Owner(s) | Sandy River Solar, LLC | — | — |
| Status | Operating | operating | — |
Sandy River Solar (CSG) is a 1.9 MW solar photovoltaic power plant located in Clackamas County, Oregon. The plant began operating in 2022 and has a single generator. It is owned and operated by Sandy River Solar, LLC. The plant's primary fuel source is solar energy. It utilizes single-axis tracking technology to maximize solar energy capture.
The plant operates within the Portland General Electric Company balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In its latest year of operation, Sandy River Solar generated 3,131 MWh of electricity, achieving a capacity factor of 18.7%. In terms of size, the plant ranks 133rd out of 147 solar plants in Oregon and 5395th out of 7108 solar plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
Portland General Electric Company
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
69 MWh
Latest Month
3.1K MWh
Annual Generation
18.7%
Capacity Factor
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.