1 MW Solar operating in Madison, TN — Tennessee Valley Authority
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2022
Operating Since
Coordinates
35.6091, -88.9156
County
Madison, TN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | SR Jackson II, LLC | SR Jackson II | — |
| Owner(s) | SR Jackson II, LLC | — | — |
| Status | Operating | operating | — |
SR Jackson II is a 1 MW solar photovoltaic power plant located in Madison County, Tennessee. The plant began operating in 2022 and is owned and operated by SR Jackson II, LLC. It utilizes a single-axis tracking system to maximize solar energy capture. The plant is connected to the Tennessee Valley Authority balancing authority within the SERC NERC region.
In its most recent year of operation, SR Jackson II generated 3,329 MWh of electricity, achieving a capacity factor of 37.9%. The plant consists of a single generator. In terms of size, SR Jackson II ranks as the 60th largest power plant in Tennessee out of 60 plants, and 6683rd nationally out of 7108 plants. The plant's primary fuel source is solar energy.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Tennessee Valley Authority
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
130 MWh
Latest Month
3.3K MWh
Annual Generation
37.9%
Capacity Factor
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.