2 MW Solar operating in Berkshire, MA — ISO New England Inc.
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2017
Operating Since
Coordinates
42.3409, -73.3965
County
Berkshire, MA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | LSE Corona Austrina LLC | Strata Manager | — |
| Owner(s) | LE Corona Austrina, LLC | LE Corona Austrina LLC [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as LE Corona Austrina LLC [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
The Truck Stop solar photovoltaic plant is located in Berkshire County, Massachusetts. The plant, owned and operated by LSE Corona Austrina LLC, has a total capacity of 2 MW. It began operating in 2017 and consists of a single generator utilizing fixed-tilt solar tracking technology.
The plant's latest annual generation was 2,790 MWh, resulting in a capacity factor of 15.9%. Truck Stop is connected to the ISO New England Inc. balancing authority and operates within the Northeast Power Coordinating Council (NPCC) NERC region. The plant ranks 207th in size among Massachusetts power plants and 4600th nationally.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
13.8 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
61 MWh
Latest Month
2.8K MWh
Annual Generation
15.9%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Tanglewood Substation · 14 kV
Substation Distance
< 10 km
Operator
Boston Symphony Orchestra
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
—
Pricing Hub
.H.INTERNAL_HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.