4.8 MW Solar operating in Chatham, NC — Duke Energy Progress East
4.8 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2018
Operating Since
Coordinates
35.6883, -79.1369
County
Chatham, NC
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Strata Manager, LLC | Strata Manager | — |
| Owner(s) | Tinker Farm, LLC | Tinker Farm LLC [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as Tinker Farm LLC [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
The Tinker (NC) solar photovoltaic plant is located in Chatham County, North Carolina. The plant has a total capacity of 4.8 MW and consists of a single generator. It commenced operations in 2018 and is operated by Strata Manager, LLC. The plant utilizes fixed tilt solar tracking technology.
Tinker (NC) is interconnected to the Duke Energy Progress East balancing authority within the SERC NERC region. In its latest year of reported generation, the plant produced 8,193 MWh of electricity, achieving a capacity factor of 19.4%. The plant ranks 548th out of 770 power plants in North Carolina and 3,179th out of 7,108 plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Duke Energy Progress East
Grid Voltage
22.86 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
510 MWh
Latest Month
8.2K MWh
Annual Generation
19.4%
Capacity Factor