2.5 MW Solar operating in Kennebec, ME — ISO New England Inc.
2.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2022
Operating Since
Coordinates
44.3612, -69.7964
County
Kennebec, ME
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Maine DG Solar Augusta, LLC | Maine DG Solar Augusta | — |
| Owner(s) | Maine DG Solar Augusta, LLC | — | — |
| Status | Operating | operating | — |
The Augusta solar photovoltaic plant is located in Kennebec County, Maine. The plant, owned and operated by Maine DG Solar Augusta, LLC, has a total capacity of 2.5 MW. It began operating in 2022 and consists of a single generator utilizing single-axis solar tracking technology. The plant's primary fuel source is solar energy.
In its most recent year of operation, Augusta generated 4,671 MWh of electricity, achieving a capacity factor of 21.3%. The plant operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. Augusta ranks as the 127th largest power plant in Maine out of 153, and 4270th nationally out of 7108 plants.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
35 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
171 MWh
Latest Month
4.7K MWh
Annual Generation
21.3%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
North Augusta Substation · 115 kV
Substation Distance
0.283 km
Operator
Central Maine Power Company
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.N_AUGSTA34.5
Pricing Hub
.Z.MAINE
Node Source
Curated node match
3 data centers proposed across Washtenaw County. Here’s where each stands.
Protest, pushback from opponents surrounds proposed computer data projects in Ypsilanti, Augusta, and Saline townships.
Augusta Solar, landowners were rejected in 2019. The lawsuit lasted nearly four years.
VERONA – In May, the Augusta County Planning Commission declined to recommend Augusta Solar, a proposed large scale solar energy system in...
Augusta Solar, landowners were rejected in 2019. The lawsuit lasted nearly four years.
VERONA – In May, the Augusta County Planning Commission declined to recommend Augusta Solar, a proposed large scale solar energy system in...
First shared solar projects in Virginia include two in Augusta County
The first five shared solar projects in Virginia history are operating and providing low-cost clean energy to low-income customers.
Last updated 2026-03-26
View all 5 articles