2.8 MW Solar operating in Fresno, CA — California Independent System Operator
2.8 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2022
Operating Since
Coordinates
36.6591, -119.7329
County
Fresno, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Forefront Power, LLC | Forefront Power | — |
| Owner(s) | Forefront Power, LLC | — | — |
| Status | Operating | operating | — |
The Fresno County Juvenile Hall solar photovoltaic plant is located in Fresno County, California. The plant has a total capacity of 2.8 MW and began operating in 2022. It is owned and operated by Forefront Power, LLC. The facility consists of a single generator utilizing solar photovoltaic technology with single-axis tracking.
The plant's primary fuel source is solar energy. In its most recent year of operation, the plant generated 552 MWh of electricity, resulting in a capacity factor of 2.2%. The Fresno County Juvenile Hall plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. It is ranked as the 441st largest solar plant in California out of 862, and 4122nd nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
21 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
206 MWh
Latest Month
552 MWh
Annual Generation
2.2%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
KCRDCT1_7_B1
Pricing Hub
TH_ZP26_GEN-APND
Node Source
Curated node match