2.5 MW Solar testing in Ventura, CA — California Independent System Operator
2.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
—
Operating Since
Coordinates
34.2500, -119.2500
County
Ventura, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Forefront Power, LLC | Forefront Power | — |
| Owner(s) | Forefront Power, LLC | — | — |
| Status | Testing | construction | — |
Located in Ventura County, California, the CA-Ventura County CCD-Ventura College solar photovoltaic plant has a total capacity of 2.5 MW. The plant, identified by the EIA plant code 65527, utilizes solar energy as its primary fuel source. It consists of a single generator and employs fixed-tilt solar tracking technology. Forefront Power, LLC is the operator of the facility.
The plant operates within the California Independent System Operator (CAISO) balancing authority and is situated in the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, the CA-Ventura County CCD-Ventura College plant is ranked 465th out of 862 solar plants in California, and 4296th nationally out of 7108 plants.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
21 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
San Miguel Substation · 66 kV
Substation Distance
4.724 km
Operator
Southern California Edison
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
MANDLY3G_7_N001
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match