3.8 MW Solar operating in Gloucester, NJ — PJM Interconnection, LLC
3.8 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2020
Operating Since
Coordinates
39.7937, -75.1059
County
Gloucester, NJ
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Public Service Elec & Gas Co | Public Service Elec & Gas | — |
| Owner(s) | Public Service Elec & Gas Co | — | — |
| Status | Operating | operating | — |
The Kinsley II Landfill Solar System is a 3.8 MW solar photovoltaic power plant located in Gloucester County, New Jersey. The plant began operating in 2020 and has one generator. Public Service Electric & Gas Co. (PSE&G) operates the facility, which utilizes a fixed-tilt solar tracking system. The plant's primary fuel source is solar energy.
In its most recent year of operation, the Kinsley II Landfill Solar System generated 5,851 MWh of electricity, achieving a capacity factor of 17.5%. The plant is interconnected to the PJM Interconnection, LLC balancing authority, operating within the RFC NERC region. Kinsley II ranks as the 105th largest solar plant in New Jersey out of 328, and 3,586th nationally out of 7,108.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
13 kV
Regulatory Status
RE
Entity Type
Investor-Owned Utility
Sector
Electric Utility
247 MWh
Latest Month
5.9K MWh
Annual Generation
17.5%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Retired Wenonah Substation formely 69KV
Substation Distance
4.707 km
Operator
Atlantic City Electric
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
TERRACE 69 KV BUS1
Pricing Hub
WESTERN HUB
Location Type
Load Node
Node Source
Curated node match