5 MW Solar operating in Onondaga, NY — New York Independent System Operator
5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2022
Operating Since
Coordinates
43.1912, -76.3899
County
Onondaga, NY
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | OYA Church Road A LLC | OYA Church Road A | — |
| Owner(s) | OYA Church Road A LLC | — | — |
| Status | Operating | operating | — |
OYA Church Road is a 5 MW solar photovoltaic power plant located in Onondaga County, New York. The plant, which began operating in 2022, is owned and operated by OYA Church Road A LLC. It consists of a single generator utilizing single-axis tracking technology to maximize solar energy capture. The plant is connected to the New York Independent System Operator (NYISO) grid and falls within the North American Electric Reliability Corporation (NERC) NPCC region.
In its most recent year of operation, OYA Church Road generated 8,247 MWh of electricity, achieving a capacity factor of 18.8%. The plant's financial data is tracked by Lawrence Berkeley National Laboratory (LBNL). In terms of size, OYA Church Road ranks as the 113th largest solar plant in New York State out of 695, and 2390th nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
New York Independent System Operator
Grid Voltage
13.2 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
243 MWh
Latest Month
8.2K MWh
Annual Generation
18.8%
Capacity Factor
$57.5/MWh
LCOE (Levelized Cost)
$30.9/MWh
Energy Value
Market Position
ISO/RTO Market
NYISO
LMP Node
BRISTLHL_115KV_TB1
Pricing Hub
NYISO Zone E
Node Source
Plant coordinates only