225 MW BESS testing in Tulare, CA — California Independent System Operator
225 MW
Nameplate Capacity
2
Generators
units
Batteries
Technology
—
Operating Since
Coordinates
36.1079, -118.9409
County
Tulare, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Southern California Edison Co | Southern California Edison | — |
| Owner(s) | Southern California Edison Co | Edison International | — |
| Status | Testing | — | — |
The Anode (Springville) BESS is a battery energy storage system located in Tulare County, California. The plant has a total capacity of 225 MW and consists of 2 generators utilizing battery technology. It is owned by Edison International and operated by Southern California Edison Co. The plant's primary fuel source is electricity (MWH), indicating it charges from the grid.
The Anode (Springville) BESS operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, the plant is ranked 60th out of 112 energy facilities in California and 241st out of 514 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
66 kV
Regulatory Status
RE
Entity Type
Investor-Owned Utility
Sector
Electric Utility
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Springville Substation · 220 kV
Substation Distance
0.544 km
Operator
Southern California Edison
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
SPRINGVL_6_N006
Pricing Hub
TH_SP15_GEN-APND
Secondary Zone
TH_ZP26_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match