2 MW Solar operating in Sonoma, CA — California Independent System Operator
2 MW
Nameplate Capacity
2
Generators
units
Solar Photovoltaic
Technology
2021
Operating Since
Coordinates
38.2614, -122.7370
County
Sonoma, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Bodega Avenue Solar LLC | Bodega Avenue Solar | — |
| Owner(s) | Bodega Avenue Solar LLC | — | — |
| Status | Operating | operating | — |
Bodega Avenue Solar LLC is a 2 MW solar photovoltaic power plant located in Sonoma County, California. The plant, owned and operated by Bodega Avenue Solar LLC, began commercial operation in 2021. It utilizes two solar generators with single-axis tracking. The plant is interconnected to the California Independent System Operator (CAISO) balancing authority, within the Western Electricity Coordinating Council (WECC) NERC region.
In its latest year of operation, Bodega Avenue Solar LLC generated 4,461 MWh of electricity, achieving a capacity factor of 25.4%. The plant is fueled by solar energy (SUN). It ranks as the 514th largest solar facility in California out of 862, and 4840th nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
12 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
141 MWh
Latest Month
4.5K MWh
Annual Generation
25.4%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_NP15_GEN-APND
Node Source
Shared substation inference