2.6 MW Solar operating in Ventura, CA — California Independent System Operator
2.6 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
34.3020, -118.8338
County
Ventura, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Forefront Power, LLC | Forefront Power | — |
| Owner(s) | Forefront Power, LLC | — | — |
| Status | Operating | operating | — |
Located in Ventura County, California, the Moorpark College solar photovoltaic plant has a total capacity of 2.6 MW. The plant, identified by plant ID 65365, began operating in 2023 and is owned and operated by Forefront Power, LLC. It utilizes one solar photovoltaic generator with a fixed-tilt tracking system. The plant is interconnected to the California Independent System Operator (CAISO) balancing authority within the Western Electricity Coordinating Council (WECC) NERC region.
In its most recent year of operation, the Moorpark College plant generated 4,504 MWh of electricity, achieving a capacity factor of 19.7%. The plant is fueled by solar energy (SUN). In terms of size, the Moorpark College plant ranks 450th out of 862 solar plants in California and 4185th nationally out of 7108 plants.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
21 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
231 MWh
Latest Month
4.5K MWh
Annual Generation
19.7%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_SP15_GEN-APND
Node Source
OSM spatial match