1.5 MW Solar operating in Riverside, CA — California Independent System Operator
1.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2018
Operating Since
Coordinates
33.9935, -117.5539
County
Riverside, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | MN8 Energy LLC | MN8 Energy | — |
| Owner(s) | MN8 Energy LLC | — | — |
| Status | Operating | operating | — |
Chambers 4 - Eastvale DCA2 is a 1.5 MW solar photovoltaic power plant located in Riverside County, California. The plant began operating in 2018 and has one generator. MN8 Energy LLC is the owner and operator. The plant utilizes a fixed tilt solar tracking system.
The facility's latest annual generation was 424 MWh, resulting in a capacity factor of 3.2%. Chambers 4 - Eastvale DCA2 operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. The plant ranks 652 out of 862 solar facilities in California and 5929 out of 7108 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
0.48 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
137 MWh
Latest Month
424 MWh
Annual Generation
3.2%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Mira Loma Substation · 500 kV
Substation Distance
1.575 km
Operator
Southern California Edison
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
MIRALOMA_6_N002
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match