5 MW BESS operating in Brunswick, NC — Duke Energy Progress East
5 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2024
Operating Since
Coordinates
33.9939, -78.2245
County
Brunswick, NC
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | North Carolina El Member Corp | — | — |
| Owner(s) | North Carolina El Member Corp | — | — |
| Status | Operating | — | — |
Zion Hill BESS is a 5 MW battery energy storage system located in Brunswick County, North Carolina. The plant began operating in 2024 and is owned and operated by North Carolina Electric Membership Corporation. It is connected to the Duke Energy Progress East balancing authority within the SERC NERC region. The facility ranks as the 17th largest of 36 battery storage sites in North Carolina, and 963rd nationally out of 1205 such sites.
The Zion Hill BESS utilizes lithium-ion battery chemistry and has a total storage capacity of 10 MWh, providing a duration of 2 hours at its full 5 MW output. The plant consists of a single generator. The primary fuel type is listed as 'MWH', indicating that it draws power from the grid to charge its batteries.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Duke Energy Progress East
Grid Voltage
13.2 kV
Regulatory Status
RE
Entity Type
Cooperative
Sector
Electric Utility
−29 MWh
Net Charging
-473 MWh
Annual Net Energy
-1.1%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.