108 MW Natural Gas standby in Santa Cruz, AZ — Tucson Electric Power Company
108 MW
Nameplate Capacity
4
Generators
units
Natural Gas Fired Combustion Turbine
Technology
1989
Operating Since
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | UNS Electric, Inc | UNS Electric | — |
| Owner(s) | UNS Electric, Inc | Fortis | — |
| Status | Standby | — | — |
The Valencia power plant is a 108 MW natural gas-fired facility located in Santa Cruz County, Arizona. It began operating in 1989 and consists of four natural gas-fired combustion turbine generators. The plant is owned by Fortis, a Canadian company, and operated by UNS Electric, Inc., a subsidiary of Fortis. Valencia operates within the Tucson Electric Power Company balancing authority and the Western Electricity Coordinating Council (WECC) NERC region.
In the latest year of reported generation, Valencia produced 4,779 MWh of electricity, achieving a capacity factor of 0.5%. According to available data, the plant ranks 25th out of 26 power plants in Arizona and 917th out of 945 plants nationally. Financial data indicates an installed cost of $285.45 per kW, based on FERC filings.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
Tucson Electric Power Company
Grid Voltage
138 kV
Regulatory Status
RE
Entity Type
Investor-Owned Utility
Sector
Electric Utility
382 MWh
Latest Month
4.8K MWh
Annual Generation
0.5%
Capacity Factor
$346/kW
Installed Cost
$217.5/MWh
Operating Cost
UNS Electric, Inc.
Reporting Utility
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.
Monsoon causes Sky Harbor damage, downed trees in Tempe, flood concerns around Yuma
Monday's storm left tens of thousands of houses and business without power, and caused extensive delays at Phoenix Sky Harbor Airport as...
Monsoon causes Sky Harbor damage, downed trees in Tempe, flood concerns around Yuma
Monday's storm left tens of thousands of houses and business without power, and caused extensive delays at Phoenix Sky Harbor Airport as...
Apple to invest $100 billion more in US; here’s how Arizona will benefit
President Donald Trump is expected to celebrate at the White House a commitment by Apple to increase its U.S. investments by an additional...
APS, SRP, and TEP look to build second nuclear plant to meet Arizona’s rising energy demand
Arizona's three largest utility providers are eying ways to help meet the state's growing energy needs, and nuclear power appears to be their top choice.
Last updated 2026-03-26
View all 10 articles