2 MW Solar operating in San Bernardino, CA — California Independent System Operator
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
35.5820, -116.9240
County
San Bernardino, CA
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Forefront Power, LLC | Forefront Power | — |
| Owner(s) | Forefront Power, LLC | — | — |
| Status | Operating | operating | — |
The CA - DGS RFP - RJ Donovan State Prison is a 2 MW solar photovoltaic power plant located in San Bernardino County, California. The plant began operating in 2024 and has one generator. Forefront Power, LLC is the plant's operator.
The plant's primary fuel source is solar energy. It utilizes single-axis tracking technology to maximize solar capture. The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In its latest year of operation, the plant generated 5,141 MWh of electricity, achieving a capacity factor of 29.2%. The plant is ranked as the 504th largest in California out of 862 plants, and 4625th nationally out of 7108 plants.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
21 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
261 MWh
Latest Month
5.1K MWh
Annual Generation
29.2%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_ZP26_GEN-APND
Node Source
Plant coordinates only