2 MW Solar operating in Litchfield, CT — ISO New England Inc.
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2021
Operating Since
Coordinates
41.8291, -73.0749
County
Litchfield, CT
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | DG Connecticut III, LLC | DG Connecticut III | — |
| Owner(s) | DG Connecticut III, LLC | — | — |
| Status | Operating | operating | — |
Torrington Solar One, LLC is a 2 MW solar photovoltaic power plant located in Litchfield County, Connecticut. The plant began operating in 2021 and has one generator. DG Connecticut III, LLC is the owner and operator. The plant's primary fuel source is solar energy. It is ranked 36th out of 88 solar plants in Connecticut and 4890th nationally out of 7108 plants. The solar panels are installed with a fixed tilt.
The plant operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In its latest year of operation, Torrington Solar One generated 3,154 MWh of electricity, achieving a capacity factor of 18.0%.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
23 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
173 MWh
Latest Month
3.2K MWh
Annual Generation
18.0%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Franklin Drive Substation · 115 kV
Substation Distance
4.668 km
Operator
Eversource
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
UN.FRNKLNDR13.2FRDR
Pricing Hub
.Z.CONNECTICUT
Node Source
Curated node match