2 MW Solar operating in Winona, MN — Midcontinent Independent Transmission System Operator, Inc..
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2021
Operating Since
Coordinates
44.0409, -91.7672
County
Winona, MN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Greenbacker Renewable Energy Corporation | Greenbacker Renewable Energy | — |
| Owner(s) | Greenbacker Renewable Energy Corporation | — | — |
| Status | Operating | operating | — |
The Stockton solar photovoltaic plant is located in Winona County, Minnesota. The plant has a total capacity of 2 MW and consists of a single generator. It commenced operations in 2021 and is owned and operated by Greenbacker Renewable Energy Corporation. The plant utilizes single-axis tracking to maximize solar energy capture.
Stockton's latest annual generation was 4,063 MWh, resulting in a capacity factor of 23.1%. The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the Midwest Reliability Organization (MRO) NERC region. In terms of size, the Stockton plant ranks 161st out of 540 power plants in Minnesota, and 4873rd out of 7108 plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
8.4 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
88 MWh
Latest Month
4.1K MWh
Annual Generation
23.1%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
OSM spatial match