250 MW Solar planned in Montgomery, NY — New York Independent System Operator
250 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
Planned: —
Planned Operation
Coordinates
42.9191, -74.3412
County
Montgomery, NY
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Repsol Renewables NA | ConnectGen | — |
| Owner(s) | Repsol Renewables NA | ConnectGen [100%] | — |
| Status | Planned | announced | — |
GEM identifies the owner as ConnectGen [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
Mill Point Solar is a 250 MW solar photovoltaic power plant located in Montgomery County, New York. The plant is owned and operated by Repsol Renewables NA. It utilizes a fixed-tilt solar tracking system. As of the latest rankings, Mill Point Solar is the third-largest solar plant in New York State out of 16, and the 144th largest in the United States out of 639.
The plant connects to the grid within the New York Independent System Operator (NYISO) balancing authority, which falls under the Northeast Power Coordinating Council (NPCC) NERC region. Public sources indicate that regulatory issues have been a prominent topic in news coverage of the plant.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
New York Independent System Operator
Grid Voltage
345 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Market Position
ISO/RTO Market
NYISO
LMP Node
REGAN___SOLAR
Pricing Hub
NYISO Zone F
Node Source
Curated node match
Montgomery County to mount legal challenge to large-scale solar permits
FONDA — Montgomery County will mount a legal challenge against the state siting permit issued for the 250-megawatt Mill Point Solar I...
Montgomery County to mount legal challenge to large-scale solar permits
FONDA — Montgomery County will mount a legal challenge against the state siting permit issued for the 250-megawatt Mill Point Solar I...
Montgomery County to mount legal challenge to large-scale solar permits
FONDA — Montgomery County will mount a legal challenge against the state siting permit issued for the 250-megawatt Mill Point Solar I...
Renewable Energy Update 1.29.26
Construction work can restart on the 95-percent-complete Vineyard Wind 1 offshore wind farm after the U.S. District Court for the District...
Last updated 2026-03-26