4 MW Batteries (2 MW) + Solar Photovoltaic (2 MW) operating in Orange, NY — ISO New England Inc.
4 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2021
Operating Since
Coordinates
41.3690, -74.3674
County
Orange, NY
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AES Distributed Energy | AES Distributed Energy | — |
| Owner(s) | AES Distributed Energy | — | — |
| Status | Operating | operating | — |
Glenmere Lake is a 4 MW hybrid power plant located in Orange County, New York. The facility, which began operating in 2021, is owned and operated by AES Distributed Energy. It combines solar photovoltaic generation with battery energy storage, using two generators and a lithium-ion battery system with 7.5 MWh of storage capacity and a 3.75-hour duration. The solar array uses a fixed-tilt configuration. The plant's primary fuel type is listed as MWH, reflecting its hybrid nature.
In its most recent year of operation, Glenmere Lake generated 3,579 MWh of electricity, resulting in a capacity factor of 10.2%. The plant operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In terms of size, Glenmere Lake ranks as the 51st largest power plant out of 65 in New York State, and 1029th out of 1205 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
13.2 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
159 MWh
Net Discharge
3.6K MWh
Annual Net Energy
10.2%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
No financial data available for this plant.
Market Position
ISO/RTO Market
ISO-NE
LMP Node
—
Pricing Hub
—
Node Source
Plant coordinates only