5 MW Solar operating in Bertie, NC — PJM Interconnection, LLC
5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2021
Operating Since
Coordinates
36.0212, -76.8736
County
Bertie, NC
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Greenbacker Renewable Energy Corporation | Greenbacker Renewable Energy | — |
| Owner(s) | Greenbacker Renewable Energy Corporation | — | — |
| Status | Operating | operating | — |
Windsor Hwy 17 Solar is a 5 MW solar photovoltaic power plant located in Bertie County, North Carolina. The plant began operating in 2021 and has one generator. It is owned and operated by Greenbacker Renewable Energy Corporation. The facility utilizes single-axis tracking to maximize solar energy capture.
The plant's primary fuel source is the sun. In its most recent year of operation, Windsor Hwy 17 Solar generated 11,055 MWh of electricity, achieving a capacity factor of 25.2%. The plant operates within the PJM Interconnection, LLC balancing authority and the SERC NERC region. Windsor Hwy 17 Solar ranks as the 464th largest power plant in North Carolina out of 770, and 3053rd nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
34.5 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
592 MWh
Latest Month
11.1K MWh
Annual Generation
25.2%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
PJM
LMP Node
CASHIE 35 KV TX1
Pricing Hub
DOMINION HUB
Location Type
Load Node
Node Source
Curated node match