5 MW Solar operating in Solano, CA — California Independent System Operator
5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2021
Operating Since
Coordinates
38.0971, -122.1409
County
Solano, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Greenbacker Renewable Energy Corporation | Greenbacker Renewable Energy | — |
| Owner(s) | Greenbacker Renewable Energy Corporation | — | — |
| Status | Operating | operating | — |
Lake Herman is a 5 MW solar photovoltaic power plant located in Solano County, California. The plant began operating in 2021 and has a single generator. It is owned and operated by Greenbacker Renewable Energy Corporation. The facility utilizes single-axis tracking to maximize solar energy capture.
In its most recent year of operation, Lake Herman generated 13,037 MWh of electricity, achieving a capacity factor of 29.7%. The plant is connected to the California Independent System Operator (CAISO) balancing authority and operates within the Western Electricity Coordinating Council (WECC) NERC region. Lake Herman ranks as the 278th largest solar plant in California out of 862, and 3016th nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
12 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
442 MWh
Latest Month
13.0K MWh
Annual Generation
29.7%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Bahia Substation · 230 kV
Substation Distance
0.003 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
EXXONBH_7_N005
Pricing Hub
TH_NP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match