324 MW Solar planned in Millard, UT — Los Angeles Department of Water and Power
324 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
Planned: —
Planned Operation
Coordinates
39.5201, -112.6602
County
Millard, UT
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Notch Peak Solar LLC | BayWa R.E. | — |
| Owner(s) | Notch Peak Solar LLC | BayWa R.E. AG [100%] | — |
| Status | Planned | pre-construction | — |
GEM identifies the owner as BayWa R.E. AG [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
Notch Peak Solar LLC is a 324 MW solar photovoltaic power plant located in Millard County, Utah. The plant, owned and operated by Notch Peak Solar LLC, utilizes fixed-tilt solar tracking technology. It is the largest solar plant in Utah and ranks 64th nationally out of 639 solar facilities. The plant's primary fuel source is the sun.
The plant has one generator. It operates within the Western Electricity Coordinating Council (WECC) NERC region, but unusually, its balancing authority is the Los Angeles Department of Water and Power, rather than a Utah-based entity.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
Los Angeles Department of Water and Power
Grid Voltage
kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.