74.5 MW Solar operating in Polk, FL — Tampa Electric Company
74.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2022
Operating Since
Coordinates
27.8169, -81.9590
County
Polk, FL
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Tampa Electric Co | Tampa Electric | — |
| Owner(s) | Tampa Electric Co | Emera | — |
| Status | Operating | operating | — |
Jamison Solar is a 74.5 MW solar photovoltaic power plant located in Polk County, Florida. The plant began operating in 2022 and is owned by Emera, a Canadian energy company. Tampa Electric Co is the EIA-listed operator, and the balancing authority is Tampa Electric Company. The plant is located within the SERC NERC region. Jamison Solar is ranked 41st out of 227 solar plants in Florida and 856th nationally out of 7108 plants.
In its most recent year of operation, Jamison Solar generated 138,907 MWh of electricity, resulting in a capacity factor of 21.3%. The plant utilizes single-axis tracking to maximize solar energy capture. Financial data indicates an installed cost of $1,358 per kW, as reported to FERC.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Tampa Electric Company
Grid Voltage
230 kV
Regulatory Status
RE
Entity Type
Investor-Owned Utility
Sector
Electric Utility
8.0K MWh
Latest Month
138.9K MWh
Annual Generation
21.3%
Capacity Factor
$1,374/kW
Installed Cost
$5.2/MWh
Operating Cost
Tampa Electric Company
Reporting Utility
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.