150 MW Batteries (50 MW) + Solar Photovoltaic (100 MW) operating in San Bernardino, CA — California Independent System Operator
150 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2021
Operating Since
Coordinates
34.6365, -117.3724
County
San Bernardino, CA
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | MN8 Energy LLC | Goldman Sachs Renewable Power | — |
| Owner(s) | MN8 Energy LLC | Goldman Sachs Renewable Power [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as Goldman Sachs Renewable Power [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
Located in San Bernardino County, California, the High Desert Hybrid plant has a total capacity of 150 MW. The plant, which came online in 2021, is owned and operated by MN8 Energy LLC. It is a hybrid facility utilizing both solar photovoltaic and battery storage technologies. The plant consists of two generators and its primary fuel source is listed as MWH. The battery energy storage system (BESS) has a capacity of 50 MWh, with a duration of 1 hour and utilizes lithium-ion battery (LIB) chemistry. The solar array uses single-axis tracking.
The High Desert Hybrid plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In its latest year of operation, the plant generated 288,956 MWh, achieving a capacity factor of 22.0%. The plant has a power purchase agreement (PPA) price of $22.34 per MWh, according to data from LBNL Solar. The plant ranks 83rd out of 112 plants in California and 383rd out of 514 plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
230 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
HARPER LAKE ENERGY STORAGE
14.5K MWh
Latest Month
289.0K MWh
Annual Generation
22.0%
Capacity Factor
$22.3/MWh
PPA Price
$10.9/MWh
Energy Value
Market Position
ISO/RTO Market
CAISO
LMP Node
HI5PV_7_N001
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
MN8 Energy inks PPA with Meta for 80 MW of solar in Pennsylvania
US independent power producer MN8 Energy LLC said on Tuesday it has signed a long-term power purchase agreement (PPA) with Meta Platforms...
Eos Energy to supply 750 MWh of battery tech for MN8 in US
US independent solar power producer MN8 Energy LLC has placed an order for 750 MWh of zinc-based battery energy storage systems (BESS) with...
MN8 Energy Announces Groundbreaking Gateway to Hunts Point Project: First-of-Its-Kind Freight EV Charging Hub and Workforce Development Center
MN8 Energy LLC, a New York-based leading renewable energy company, today announced the Gateway to Hunts Point FDC project, a transformative...
MN8 Energy Announces Groundbreaking Gateway to Hunts Point Project: First-of-Its-Kind Freight EV Charging Hub and Workforce Development Center
MN8 Energy LLC, a New York-based leading renewable energy company, today announced the Gateway to Hunts Point FDC project, a transformative...
Last updated 2026-03-26
View all 5 articlesTAMPADERO SOLAR