3 MW Solar operating in Pima, AZ — Tucson Electric Power Company
3 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2013
Operating Since
Coordinates
32.2425, -111.2583
County
Pima, AZ
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | MN8 Energy LLC | MN8 Energy | — |
| Owner(s) | Solar Star Arizona IV LLC | Solar Star Arizona IV LLC [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as Solar Star Arizona IV LLC [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
Broadway 2 - Tucson Phase II is a 3 MW solar photovoltaic power plant located in Pima County, Arizona. The plant began operating in 2013 and has one generator. It is owned and operated by MN8 Energy LLC. The facility utilizes single-axis tracking to maximize solar energy capture. Broadway 2 ranks as the 65th largest power plant in Arizona out of 93, and 3947th nationally out of 7108.
The plant's latest annual generation was 1,982 MWh, resulting in a capacity factor of 7.5%. The plant is located within the Western Electricity Coordinating Council (WECC) NERC region and operates under the balancing authority of Tucson Electric Power Company.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
Tucson Electric Power Company
Grid Voltage
24.9 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
397 MWh
Latest Month
2.0K MWh
Annual Generation
7.5%
Capacity Factor
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.