200 MW Solar operating in Webb, TX — Electric Reliability Council of Texas, Inc.
200 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2021
Operating Since
Coordinates
27.6522, -99.2472
County
Webb, TX
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Corazon Energy LLC | Eni New Energy US | — |
| Owner(s) | Corazon Energy LLC | Eni New Energy US Inc [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as Eni New Energy US Inc [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
Corazon Energy LLC is a 200 MW solar photovoltaic power plant located in Webb County, Texas. The plant, which began operating in 2021, is owned and operated by Corazon Energy LLC. It utilizes single-axis tracking technology to maximize solar energy capture. As of the most recent data, the plant ranks 115th in size among Texas power plants and 251st nationally.
The plant's latest annual generation was 369,146 MWh, resulting in a capacity factor of 21.1%. Corazon Energy LLC operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, and is subject to the NERC region TRE. Financial data is available for the plant from LBNL Solar.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
345 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Corazon Solar
21.3K MWh
Latest Month
369.1K MWh
Annual Generation
21.1%
Capacity Factor
$46.7/MWh
LCOE (Levelized Cost)
$23.7/MWh
Energy Value
Market Position
ISO/RTO Market
ERCOT
LMP Node
CORAZON_RN
Pricing Hub
HB_SOUTH
Secondary Zone
LZ_SOUTH
Location Type
Resource Node
Node Source
Curated node match
Webb County creates tax reinvestment zone for large solar project
Webb County Commissioners Court on Monday voted to establish a tax reinvestment zone for a solar farm project on nearly 9,000 acres of land...
Last updated 2026-03-14