2 MW Solar operating in Saginaw, MI — Midcontinent Independent Transmission System Operator, Inc..
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2020
Operating Since
Coordinates
43.4320, -84.1184
County
Saginaw, MI
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Geddes 1 Solar, LLC | Geddes 1 Solar | — |
| Owner(s) | Geddes 1 Solar, LLC | — | — |
| Status | Operating | operating | — |
Geddes 1 Solar, LLC is a 2 MW solar photovoltaic power plant located in Saginaw County, Michigan. The plant began operating in 2020 and has one generator. It is owned and operated by Geddes 1 Solar, LLC. The facility utilizes single-axis tracking to maximize solar energy capture.
The plant's latest annual generation was 2,602 MWh, resulting in a capacity factor of 14.8%. Geddes 1 Solar, LLC operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority. In terms of size, the plant ranks 66th out of 84 solar facilities in Michigan and 5101st nationally out of 7108 plants.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
8.32 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
83 MWh
Latest Month
2.6K MWh
Annual Generation
14.8%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Thomas Substation · 46 kV
Substation Distance
< 10 km
Operator
Consumers Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
Cons.Cetr
Pricing Hub
MICHIGAN.HUB
Node Source
EIA-860 direct report