125 MW Solar operating in Calhoun, MI — Midcontinent Independent Transmission System Operator, Inc..
125 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
Coordinates
42.2540, -84.8130
County
Calhoun, MI
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AES Clean Energy | Ranger Power | — |
| Owner(s) | AES Clean Energy | Ranger Power [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as Ranger Power [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
The Calhoun County Solar Project is a 125 MW solar photovoltaic power plant located in Calhoun County, Michigan. The plant began operating in 2025 and is owned and operated by AES Clean Energy. It utilizes fixed-tilt solar tracking technology. The plant is interconnected to the Midcontinent Independent Transmission System Operator (MISO) grid and falls within the ReliabilityFirst Corporation (RFC) NERC region.
In its latest year of operation, the Calhoun County Solar Project generated 217,429 MWh of electricity, achieving a capacity factor of 23.7%. The facility consists of a single generator. Based on capacity, the plant ranks as the 16th largest solar facility in Michigan out of 21, and 477th nationally out of 639.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
8.1K MWh
Latest Month
217.4K MWh
Annual Generation
23.7%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Ethanol Substation · 46 kV
Substation Distance
< 10 km
Operator
Consumers Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MICHIGAN.HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
Massive 125-megawatt solar farm nears completion west of Jackson
PARMA TWP., MI – In the rural far western reaches of Jackson County there exists a sea of solar panels poised to deliver power to tens of...
EGLE announces $1.85 million in awards to support communities hosting renewable energy projects
Latest Renewables Ready Communities Awards support Michigan's clean energy transformation.
Michigan Awards $8.1M for Solar Projects
LANSING, Mich. — On Monday, the Michigan Department of Environment, Great Lakes, and Energy announced the fourth round of Renewables Ready Communities...
Consumers Energy breaks ground on new solar farm in Calhoun County
Consumers Energy and Hecate Energy broke ground Wednesday on a new solar farm in Calhoun County. The Sunfish Solar 2 project is expected to...
Last updated 2026-03-14
View all 10 articles