2.6 MW Solar operating in San Joaquin, CA — California Independent System Operator
2.6 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
37.9117, -121.1987
County
San Joaquin, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Forefront Power, LLC | Forefront Power | — |
| Owner(s) | Forefront Power, LLC | — | — |
| Status | Operating | operating | — |
The Amazon - Stockton - Roof (SCK1) - (CA) solar photovoltaic plant is located in San Joaquin County, California. The plant, which began operating in 2023, has a total capacity of 2.6 MW and consists of a single generator. It is owned and operated by Forefront Power, LLC. The plant utilizes fixed tilt solar tracking technology.
In its most recent year of operation, the plant generated 3,627 MWh of electricity, resulting in a capacity factor of 15.9%. The plant's primary fuel source is solar energy. It operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. The plant ranks as the 453rd largest solar facility in California out of 862, and 4209th nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
21 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
144 MWh
Latest Month
3.6K MWh
Annual Generation
15.9%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
CASCES_7_N008
Pricing Hub
TH_NP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match