10 MW Wood Waste operating in Waldo, ME — ISO New England Inc.
10 MW
Nameplate Capacity
1
Generators
unit
Wood/Wood Waste Biomass
Technology
2018
Operating Since
Coordinates
44.3331, -69.2008
County
Waldo, ME
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Robbins Lumber Inc | Robbins Lumber Inc | — |
| Owner(s) | Robbins Lumber Inc | Robbins Lumber | — |
| Status | Operating | operating | — |
Georges River Energy is a 10 MW wood-fired biomass power plant located in Waldo County, Maine. The plant began operating in 2018 and has one generator. It is owned and operated by Robbins Lumber Inc. The plant is interconnected to the ISO New England Inc. balancing authority and is within the Northeast Power Coordinating Council (NPCC) NERC region.
In its most recent year of operation, Georges River Energy generated 51,885 MWh of electricity, achieving a capacity factor of 59.0%. Among biomass plants in Maine, Georges River Energy ranks 5th out of 6, and nationally it ranks 77th out of 97.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
34.5 kV
Regulatory Status
NR
Entity Type
Industrial
Sector
IPP CHP
4.8K MWh
Latest Month
51.9K MWh
Annual Generation
59.0%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
ISO-NE
LMP Node
50121
Pricing Hub
.Z.MAINE
Node Source
EIA-860 direct report
Three Gorges Dam | Facts, Construction, Benefits, & Problems
Three Gorges Dam, dam on the Yangtze River (Chang Jiang) just west of the city of Yichang in China. The largest dam in the world,...
Missouri River Energy celebrates 60 years | Sioux Center News
SIOUX CENTER—The city of Sioux Center is celebrating the 60th anniversary of the creation of the Missouri River Energy Services,...
‘Ticking time bombs’: Nearly 100 coal ash dumps pepper Chesapeake Bay watershed
The use of coal to produce power in the U.S. has sharply declined in recent decades, as utilities switch to natural gas or renewable energy.
Internet data centers are fueling drive to old power source: Coal
Virginia data centers that process nearly 70 percent of global digital traffic need more electricity. Coal-fired power plants in neighboring...
Last updated 2026-03-14
View all 10 articles