1 MW Solar operating in Tolland, CT — ISO New England Inc.
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2021
Operating Since
Coordinates
42.0296, -72.5032
County
Tolland, CT
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Ecos Energy LLC | Ecos Energy | — |
| Owner(s) | Ecos Energy LLC | — | — |
| Status | Operating | operating | — |
Blair Solar is a 1 MW solar photovoltaic power plant located in Tolland County, Connecticut. The plant began operating in 2021 and is owned and operated by Ecos Energy LLC. It consists of a single generator utilizing fixed-tilt solar tracking technology. Blair Solar is interconnected to the ISO New England Inc. balancing authority, operating within the Northeast Power Coordinating Council (NPCC) NERC region.
In its most recent year of operation, Blair Solar generated 1,631 MWh of electricity, achieving a capacity factor of 18.6%. The plant's relatively small size results in a ranking of 83 out of 88 power plants in Connecticut, and 6783 out of 7108 plants nationally. Its primary fuel source is solar energy.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
23 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
66 MWh
Latest Month
1.6K MWh
Annual Generation
18.6%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Shaker Road Substation · 69 kV
Substation Distance
3.933 km
Operator
National Grid
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.FRNCONIA13.8
Pricing Hub
.Z.CONNECTICUT
Node Source
Curated node match