7.9 MW Wind operating in Appanoose, IA — Midcontinent Independent Transmission System Operator, Inc..
7.9 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2021
Operating Since
Coordinates
40.7016, -92.8535
County
Appanoose, IA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Consolidated Edison Development Inc. | — | — |
| Owner(s) | Consolidated Edison Development Inc. | — | — |
| Status | Operating | — | — |
CED Centerville Wind is a 7.9 MW wind power plant located in Appanoose County, Iowa. The plant, which began operating in 2021, is owned and operated by Consolidated Edison Development Inc. It utilizes a single onshore wind turbine manufactured by GE Wind, model GE2.8-127. The turbine has a rotor diameter of 127 meters and a hub height of 89 meters.
In its most recent year of operation, CED Centerville Wind generated 26,585 MWh of electricity, achieving a capacity factor of 38.4%. The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority. CED Centerville Wind ranks 86th out of 122 wind plants in Iowa and 1192nd out of 1424 wind plants nationally. The plant's primary fuel source is wind (WND).
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
13.2 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
2.1K MWh
Latest Month
26.6K MWh
Annual Generation
38.4%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Centerville South Substation · 69 kV
Substation Distance
< 10 km
Operator
Alliant Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.