1.9 MW Batteries (1 MW) + Solar Photovoltaic (1 MW) operating in Worcester, MA — ISO New England Inc.
1.9 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2021
Operating Since
Coordinates
42.0969, -71.5068
County
Worcester, MA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AES Distributed Energy | AES Distributed Energy | — |
| Owner(s) | AES Distributed Energy | — | — |
| Status | Operating | operating | — |
BWC Muddy Brook, LLC Hybrid is a 1.9 MW hybrid power plant located in Worcester County, Massachusetts. The plant, which began operating in 2021, is owned and operated by AES Distributed Energy. It utilizes both solar photovoltaic and battery storage technologies, with the primary fuel source listed as MWH. The facility consists of two generators and features a fixed tilt solar tracking system. The battery energy storage system (BESS) has a capacity of 1.8 MWh, a duration of 2 hours, and utilizes lithium-ion battery chemistry (LIB).
The plant operates within the ISO New England Inc. balancing authority and the NPCC NERC region. In its latest year of generation data, the plant produced 1896 MWh, achieving a capacity factor of 11.4%. BWC Muddy Brook, LLC Hybrid is ranked as the 118th largest power plant out of 126 in Massachusetts, and 1142nd out of 1205 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
13.8 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
51 MWh
Latest Month
1.9K MWh
Annual Generation
11.4%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
NEA Bellingham Substation · 345 kV
Substation Distance
1.865 km
Operator
Northeast Energy Associates LP
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
UN.BELLNGHM13.2NE1A
Pricing Hub
.H.INTERNAL_HUB
Node Source
Curated node match