20 MW Solar operating in Westmoreland, VA — PJM Interconnection, LLC
20 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2018
Operating Since
Coordinates
38.0770, -76.7860
County
Westmoreland, VA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Dominion Energy Inc. | Dominion Energy | — |
| Owner(s) | Dominion Energy Inc. | Dominion Energy | — |
| Status | Operating | operating | — |
Montross Solar is a 20 MW solar photovoltaic power plant located in Westmoreland County, Virginia. The plant began operating in 2018 and has one generator utilizing single-axis tracking. It is owned and operated by Dominion Energy Inc. The plant is connected to the PJM Interconnection, LLC balancing authority and is within the SERC NERC region.
In its most recent year of operation, Montross Solar generated 37,000 MWh of electricity, achieving a capacity factor of 21.1%. The plant's installed cost was $1,749.79 per kW. Montross Solar ranks as the 93rd largest power plant in Virginia out of 168, and 1531st nationally out of 7108 plants.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
34.5 kV
Regulatory Status
RE
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Montross Solar Facility
1.9K MWh
Latest Month
37.0K MWh
Annual Generation
21.1%
Capacity Factor
$1,430/kW
Installed Cost
$1.4/MWh
Operating Cost
VIRGINIA ELECTRIC AND POWER COMPANY
Reporting Utility
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Point of Interconnection
Nearest Substation
Montrose Substation · 35 kV
Substation Distance
< 10 km
Operator
Virginia Electric and Power Company
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
DOMINION HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
Electric utilities falling behind on emission reduction targets
Many of the nation's largest electric utilities are not on track to achieve their interim emission reduction goals or the “net-zero” targets they have...
King’s Highway Solar project discussed at community meeting
For the last several years, solar farms have been popping up in Westmoreland County. At first, they were more of a novelty, but as more have...
A hydrogen plant could rise near a former King George coal plant
Efforts to convert the site of a former coal plant in King George County into a solar and storage facility are being rerouted to develop the parcels...
King George coal plant to be converted to solar and storage
The owner of a former coal plant in King George County intends to redevelop the site as a solar and energy storage facility.
Last updated 2026-03-14
View all 5 articlesMontross Solar