2 MW Solar operating in Richland, IL — Midcontinent Independent Transmission System Operator, Inc..
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2021
Operating Since
Coordinates
38.7203, -88.1300
County
Richland, IL
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Olney Solar II, LLC | Olney Solar II | — |
| Owner(s) | Olney Solar II, LLC | — | — |
| Status | Operating | operating | — |
Olney Solar II CSG is a 2 MW solar photovoltaic power plant located in Richland County, Illinois. The plant began operating in 2021 and has a single generator. It is owned and operated by Olney Solar II, LLC. The plant utilizes single-axis tracking to maximize solar energy capture.
In its most recent year of operation, Olney Solar II CSG generated 4,420 MWh of electricity, achieving a capacity factor of 25.2%. The plant is connected to the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority, within the SERC Reliability Corporation NERC region. Olney Solar II CSG ranks as the 238th largest power plant in Illinois out of 320, and 4996th nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
13.2 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
138 MWh
Latest Month
4.4K MWh
Annual Generation
25.2%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
ILLINOIS.HUB
Node Source
OSM spatial match