1.5 MW Solar operating in Christian, IL — Midcontinent Independent Transmission System Operator, Inc..
1.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2021
Operating Since
Coordinates
39.5130, -89.0373
County
Christian, IL
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Luminace Solar Illinois 2, LLC | Luminace Solar Illinois 2 | — |
| Owner(s) | Luminace Solar Illinois 2, LLC | — | — |
| Status | Operating | operating | — |
The GSI Group LLC at Assumption is a 1.5 MW solar photovoltaic power plant located in Christian County, Illinois. The plant began operating in 2021 and has a single generator. Luminace Solar Illinois 2, LLC is the plant's operator. The facility utilizes single-axis tracking to maximize solar energy capture.
The plant's latest annual generation was 2,420 MWh, resulting in a capacity factor of 18.4%. The GSI Group LLC at Assumption interconnects to the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority, within the SERC Reliability Corporation (SERC) NERC region. In terms of size, the plant is ranked 292nd out of 320 power plants in Illinois, and 5860th nationally out of 7108 plants.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
99 MWh
Latest Month
2.4K MWh
Annual Generation
18.4%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
ILLINOIS.HUB
Node Source
OSM spatial match