1.5 MW Solar operating in Solano, CA — California Independent System Operator
1.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2019
Operating Since
Coordinates
38.3882, -121.9374
County
Solano, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | KP Vacaville Solar, LLC | KP Vacaville Solar | — |
| Owner(s) | Citicorp North America Inc., Forsyth Street Renewables I, LLC | Citicorp North America Inc. [99%]; Forsyth Street Renewables I LLC [0%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as Citicorp North America Inc. [99%]; Forsyth Street Renewables I LLC [0%]
This entity is not yet in the GEM ownership database — chain unavailable.
Vacaville Hospital is a 1.5 MW solar photovoltaic power plant located in Solano County, California. The plant began operating in 2019 and has one generator. It is owned and operated by KP Vacaville Solar, LLC. The plant's primary fuel source is solar (SUN). Vacaville Hospital operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region.
In its latest year of reported generation, Vacaville Hospital produced 2,885 MWh of electricity, achieving a capacity factor of 21.9%. The solar array uses a fixed tilt tracking system. Vacaville Hospital ranks 606th out of 862 power plants in California and 5794th out of 7108 plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
0.48 kV
Regulatory Status
NR
Entity Type
Commercial
Sector
Commercial Non-CHP
99 MWh
Latest Month
2.9K MWh
Annual Generation
21.9%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Vaca Dixon Substation · 500 kV
Substation Distance
< 10 km
Operator
Pacific Gas and Electric Company
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_NP15_GEN-APND
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.