54.4 MW Wind operating in Pike, IL — Midcontinent Independent Transmission System Operator, Inc..
54.4 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2025
Operating Since
Coordinates
39.6206, -90.8761
County
Pike, IL
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Greenbacker Renewable Energy Corporation | PowerWorks | — |
| Owner(s) | Greenbacker Renewable Energy Corporation | PowerWorks Inc [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as PowerWorks Inc [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
The Panther Creek Wind Project is a 54.4 MW wind power plant located in Pike County, Illinois. The facility began operating in 2025 and utilizes onshore wind turbine technology. It is owned and operated by Greenbacker Renewable Energy Corporation. The plant connects to the grid within the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and the SERC NERC region.
In its most recent year of operation, Panther Creek Wind Project generated 134,239 MWh of electricity, achieving a capacity factor of 31.0%. The plant is ranked 53rd out of 59 power plants in Illinois, and 910th out of 1424 nationally. The plant consists of 1 generator.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
69 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
18.5K MWh
Latest Month
134.2K MWh
Annual Generation
31.0%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
ILLINOIS.HUB
Node Source
OSM spatial match
PJM Interconnection Opens Next Electric Capacity Auction Bidding Window Of July 9 to 15 For 2026-27 Electric Delivery; Hold Your Breath!
On July 9, the PJM Interconnection announced it has opened the next electricity capacity auction bidding window of July 9 to 15 that will...
How a Data Center Company Uses Stranded Renewable Energy
Some companies are paying low rates for renewable energy that would otherwise go unused. There's more of that than you'd think.
Trump temporarily halts leasing and permitting for wind energy projects
President Donald Trump signed an executive order Monday temporarily halting offshore wind lease sales in federal waters and pausing the...
Trump temporarily halts leasing and permitting for wind energy projects
President Donald Trump signed an executive order Monday temporarily halting offshore wind lease sales in federal waters and pausing the...
Last updated 2026-03-26