1.4 MW Solar operating in Chisago, MN — Midcontinent Independent Transmission System Operator, Inc..
1.4 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2021
Operating Since
Coordinates
45.4610, -92.9017
County
Chisago, MN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cornillie 2 Community Solar LLC | Cornillie 2 Community Solar | — |
| Owner(s) | Cornillie 2 Community Solar LLC | — | — |
| Status | Operating | operating | — |
The Cornillie 2 Community (CSG) solar plant is located in Chisago County, Minnesota. The plant, owned and operated by Cornillie 2 Community Solar LLC, began operating in 2021. It has a total capacity of 1.4 MW consisting of a single solar photovoltaic generator. The plant uses fixed-tilt solar tracking technology.
The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the MRO NERC region. In its latest year of operation, the plant generated 1,655 MWh of electricity, achieving a capacity factor of 13.5%. Cornillie 2 Community (CSG) ranks as the 177th largest solar plant in Minnesota out of 540, and 5933rd nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
15 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
10 MWh
Latest Month
1.7K MWh
Annual Generation
13.5%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Chisago Substation · 500 kV
Substation Distance
1.672 km
Operator
Xcel Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
NSP.NSTARSOLAR
Pricing Hub
MINN.HUB
Location Type
Generation Node
Node Source
Curated node match